CV - J. Brandenburg
2010-present
2002-2010
2000-2002
1991-2000
1987-1991
1985-1987
1983-1985
1980-1983
1976-1980
1973-1976
1971-1973
1965-1971
JBRconsult, technical consultant
Ballast Nedam Infra, Nieuwegein, commercial manager
Ballast Nedam International, Golden, Canada, skiresort KHMR
Ballast Nedam International, Nieuwegein, commercial affairs Middle East
Ballast Nedam International, Jakarta, Indonesia, region commercial affairs
Ballast Nedam International, Matara, Sri Lanka, University
Ballast Nedam Work preparation, Amstelveen, project preparation
Ballast Nedam International, Guyana, drainage- and irrigation works
Ballast Nedam Engineering, Amstelveen, project design department
L.W. Lievense Consultants, Saldanha, South Afrika, harbourworks
L.W. Lievense Consultants, Breda, project preparation
Study Civil Engineering TU-Delft, Engineer (Ir) in coastal engineering
Recent projects
2014-2015
Solving a conflict between the Main Contractor and Subcontractor concerning duties and entitlements of the Subcontractor at the Public Transport Terminal in Breda.
2009-2014
Arbitration between Owner and Main Civil Contractor of a 100Mw windfarm project in the Northsea concerning failure of grouted connections between the Foundation Pile and Transition Piece caused by faulty Building Regulations.
2010
Technical dispute with the client regarding settlement of adjacent buildings during construction of an underground parking garage in the Netherlands where braced steel sheetpiles were used.
2010
Technical dispute with the client regarding unequal settlement of steel storage tanks in the Netherlands build on soft subsoil resulting in necessary repairs to the tanks.
2008-2010
Claim against the client of different radar stations in UK with regard of non-availability of required construction data ultimately resulting in early termination of the contract.
2008-2009
Arbitration concerning the installation of marine cables for a windpark in the North Sea, where burried cables were left at insufficient depth below original seabed.
2006-2009
Technical dispute in arbitration with the main contractor of a bridge project at the Tagus River in Portugal concerning piledriving for foundations in the riverbed with changing soilconditions.
2003-2006
Re-negotiations with the client with regard to a jetty and breakwater project for the import of LNG in Gujarat, India in order to to delete part of the works from the contract scope due to severe site conditions.
2002-2003
Claim to client concerning numerous changes and disturbance to the scope of works for the construction of civil infrastructure and foundations forming part of a power plant in Mexico.